| Project title | DIYARBAKIR AIRBASE F-16 FACILITIES | 
| Project location | DIYARBAKIR REPUBLIC OF TURKEY | 
| Owners Name and Address
 Commencement date  | 
REPUBLIC OF TURKEY MINISTRY OF NATIONAL DEFENCE NATO. INF. DEPT.13.03.1996  | 
| Completion date | 24.04.1997 | 
| Operating Firm | E.H ARUTAN. Inc | 
| Associated Firms | GUNBETON Inc. | 
| Description of project |  
 
 · 2 each, 1250 m3 JP-8 fuel storage tanks, · 2 each Manifold / Filter stations, · 4 each Truck loading pits / Pantographs, · 2 each 10 m3 drain fuel tanks, · 4 each 120 m3/h 70 mwc Fuel pump, · 4514 m 6” PE coated stoel pipes, · 3186 m2 Epoxy coating, · 1 each 100 Kwa Transformer building · 259 m length , 3.5 m width concrete pavement  | 
| Truck loading locations Pump patsBute connecting piping and scraper trap connections 5 KM Long 6” Diaweter Fuel Pipeline between MUŞ provinceTank Farm and Airbase 
 
  | 