Project title | DIYARBAKIR AIRBASE F-16 FACILITIES |
Project location | DIYARBAKIR REPUBLIC OF TURKEY |
Owners Name and Address
Commencement date |
REPUBLIC OF TURKEY MINISTRY OF NATIONAL DEFENCE NATO. INF. DEPT.13.03.1996 |
Completion date | 24.04.1997 |
Operating Firm | E.H ARUTAN. Inc |
Associated Firms | GUNBETON Inc. |
Description of project |
· 2 each, 1250 m3 JP-8 fuel storage tanks, · 2 each Manifold / Filter stations, · 4 each Truck loading pits / Pantographs, · 2 each 10 m3 drain fuel tanks, · 4 each 120 m3/h 70 mwc Fuel pump, · 4514 m 6” PE coated stoel pipes, · 3186 m2 Epoxy coating, · 1 each 100 Kwa Transformer building · 259 m length , 3.5 m width concrete pavement |
Truck loading locations Pump patsBute connecting piping and scraper trap connections 5 KM Long 6” Diaweter Fuel Pipeline between MUŞ provinceTank Farm and Airbase
|