Project title    EASTERN ANATOLIA PIPELINE SYSTEM DIESELIATION PHASE III

 

Project location MUŞ-DIYARBAKIR-BATMAN-KOVANCILAR REPUBLIC OF TURKEY
Owners Name and Address

Commencement date

REPUBLIC OF TURKEY MINISTRY OF NATIONAL
DEFENCE NATO. INF. DEPT.14.03.1989
Completion date 29.05.1992
Operating Firm E.H ARUTAN. Inc
Associated Firms None
Description of project This project consisted of the following contruction works withinThe POL (Petroleum Oil Lines)
1 each 10.000 cu.m Steel Fuel Storage Tank coveredwith Reinforced-concrete5 each 5.000 cu.m Steel Fuel Storage Tank covered with Reinforced-concrete2 each 2.500 cu.m Steel Fuel Storage Tank covered with Reinforced-concrete2 each 1250 cu.m Steel Fuel Storage Tank covered withReinforced-concrete

8 each 100 cu.m Steel Sedimentation Tank.

10 each 10  cu.m Steel Drainage Tank

Manifolds and water separator/filtration stations

Description of project(cont’d) Truck loading locations

Pump pats

Bute connecting piping and scraper trap connections

5 KM Long 6” Diaweter Fuel Pipeline between MUŞ

province