| Project title | BANDIRMA AIRABASE | 
| Project location | BANDIRMA REPUBLIC OF TURKEY | 
| Owners Name and Address
 Commencement date  | 
REPUBLIC OF TURKEY MINISTRY OF NATIONAL DEFENCE NATO. INF. DEPT.17.09.1986  | 
| Completion date | 04.05.1989 | 
| Operating Firm | E.H ARUTAN. Inc | 
| Associated Firms | None | 
| Description of project | B.225  reinforeed concrete    841.563.m2 cu.m
 B300 “ “ 4.006.174 m2 cu.m B350 “ “ 162.735 m2 cu.m Covering concrete 8.159.460 m2 cu.m 17 each buried ammunition stores. Building of ammunition attendance and Rocket Control with three separated parts. 6.638 m concrete covered link taxi tracks. 17 each Total 13.668 m2 concrete covered plane Parking tracks. 2265 m main entrance platform of ammunition building And rocket control building. 2746 m2 concrete covered aprons oaf ammu stores. 159 m concrete covered LOX building. Petroleum Oil Line : 1250 m JP4 Storing tank. Building of filter and manifold. 2 ca. Loading unloading truck stations. Half buried LOX building 3 each LOX tank(1500 Lt) 
 The foundation and installation of Neopren Cable Insulation transformers and armature belonging to taxi-track system Lighting systems 
 
  | 
| Description of project
 (cont’d)  | 
40 KVA Frequency convertor installation.
 20 KVA 220/380 V 50 Hz. Automatic 1 each 100 KVA Diesel generator group 1 each 85 KVA “ “ “ 
 High Tension and Low tension energy distribution Cables and 100,200 KVA reducing transformer and Shalt installation.  | 