Project title ÇARDAK AIRBASE
Project location ÇARDAK – DENİZLİ REPUBLIC OF TURKEY
Owners Name and Address

Commencement date

REPUBLIC OF TURKEY MINISTRY OF NATIONAL DEFENCE NATI. INF. DEPT.

28.06.1985

Completion date 01.09.1987
Operating Firm E. H. ARUTAN Inc. (The Leader Firm)
Associated Firms YÜKSEK B. UZHAN
Description of project  – Half buried fuel oil storing tanks of 2×1250 m2 cu.m

– 1 each truck discharge pithole.

– 2 each truck loading pithole.

– 1 each Three way valve pithole.

– 1 each insulation pithole.

– 2 each drainage tank of 10 m2

– 2 each Puping station with capacity of 120 m2/h 100 mYs

– 6° Cathodic protected fuel oil pipe line with a length of 3750 m.

– 1 each Manifold filter/water separator station.

– Wagon discharge pumping station

– 2 each wagon discharge station

– 1 each drainage tank of 4 m cu.m

– 1 each Valve pithole.

– Spare war parts for 90 days.

Two each half buried reinforced concrete fuel oil storing tanks of 1250 m2( which inner parts are covered with metal sheets.) wagon discharge plantations, truck discharge and manifold/filtered water separation station, valf and insulation pitholes. 3750 m fuel oil pipeline of 6 ° diameter, and its cathodical protection complete lighting system for area including taxiway, distance, approach, lights, regulators, remote control tables.

Such lighting systems; fixed current regulators, insulation transformators, lamp groups and cables. 17 each main transformer centers, air conditioning system with fully automatic.

 

Heating capacity of 90.000 kcal/ h and cooling capacity of 45.000 kcal/4 protected fleet buildings, 160 Tons steel constructions, 271 tons various iron works, concrete production with a strength of 10.600 m2 B-225 reinforced concrete. Water supply systems, including distribution and storing facilities. Flight control units. Two each 500-S – 8 type airplane stoppers and their accessories.

Diesel Generator Groups and details

-1 each 120 KVA.

-2 each 100 KVA.

-1 each 80 KVA

-2each 100 KVA Automatic.

-1each 150 KVA Manuel

 

Freuency Converters and details

-1 each 20 KVA

-1 each 50 KVA,

 

16 Km of cable works are included in the scope of work. Spare war parts for 90 days.