Project title UMURYERI NAVAL BASE FINGER TYPE PIER,BREAKWATER
Project location

Owners Name and Address

ISTANBUL

REPUBLIC OF TURKEY

REPUBLIC OF TURKEY MINISTRY OF NATIONAL DEFENCE NATO. INF. DEFT.

Commencement date 26.10.1979
Completion date 14.04.1982
Operating Firm H. ARUTAN.
Associated Firms None
Description of project 2338 m3,B-225 reinforced concrete

2069 ,dB-300 reinforced concrete.

3 Each 275 KVA Diesel Generator Group

3 Each 150 KVA

Auto Fire Alarm Systems.

Power transmission systems and cables.

2 Each 50 m144 100 MSS Fuel Pumps.

I Each 500 M Fuel Tank.

Within the scope of UMURYERI Finger Type piers and break. water construction and installation project.

a) Four Finger Type Piers of total 600 mts. long with 406 pieces reinforced concrete piles and having on access of approach on both sides have been built in a variety depth of water between min-4 mt and max-12 mt.

b) The Total amount of Class B 225 reinforced and B 300 reinforced concrete as indicated on the referred certificate was 4407 nryof which 3357 m was used in the pier section.

c) Total amount of protective filling rocks of various categories was 416,269 tons of which 393,438 tons were used in the break-water section and the rest 16131 tons in the pier section.

d) Dredging carried out in a depth of-4 mt.was 24.649 n’t cum